TY - JOUR AU - Osman, Ashraf AU - Baneh, Bira Wafaei AU - Deiranloei, Masoud Rahmati AU - Baneh, Koosha Wafaei PY - 2026 DA - 2026/09/07 TI - Modular Integrated Construction Management of Post-Disaster Settlements JO - Recent Progress in Science and Engineering SP - 019 VL - 02 IS - 03 AB - This research addresses how BIM can help manage the construction of post-disaster settlements utilizing the MiC technique. First, previous research work in this field is reviewed. Then, the challenges explored through literature synthesis and prioritization of BIM usage in the management of MiC projects were identified based on the qualitative opinions of a group of experts. After that, an approach to achieve selected and potential applications of BIM in the management of temporary housing projects based on MiC is explained through a case study. Finally, measuring the effectiveness of BIM in managing construction projects in crisis conditions is done by organizing interviews with groups of experts. The results indicate that utilizing the BIM model in a prefab temporary housing project based on MiC effectively improves the 3D visualization and simulation of the project, creates better communication and coordination between designers and contractors, ensuring high quality for the product, helping in planning the assembly and management of the project, and supporting estimation and quantity surveying, and eliminating construction element interference. SN - 3067-4573 UR - https://doi.org/10.21926/rpse.2603019 DO - 10.21926/rpse.2603019 ID - Osman2026 ER -